grk-forsterst-cover

Forster Street

Forster Street: a 3-storey build which included all aspects of plumbing, gas fitting, fire services, project and main storm water services and install new main sewer for subdivision at front of block. This project was undertaken over a 9 month

Read More →

grk-indshedwacol-cover

Industrial Shed – Wacol

Wacol: New industrial shed for a crane hire company. Included all civil storm water, sewer, fire, rain water, storm water and mains water. A new water main connection from council was required for this project. GRK vacuum excavated to council

Read More →

grk-arb-cover

ARB Distribution Shed

ARB Distribution shed: The industrial distribution centre for ARB. GRK undertook all services to this building including all civil, plumbing, fire, gas, storm water and mains water. This project required a diesel fire pump to be installed to achieve the

Read More →

grk-stalvernia-cover

Mount Alvernia College

Mt Alvernia: This project started in 2012 and will be completed in the early stages of 2015. We have realistically re-plumbed 75% of the School again. This project with variations has predominately doubled in size since we undertook stage 1.

Read More →

grk-sansiscocollege-cover

San Sisto College

San Sisto College: This project involved a couple of new buildings and a renovation of the existing administration building. New main sewer and storm water had to brought up through a main corridor of the school to service new projects.

Read More →

grk-sirthomasmore-cover

St Thomas More College

St Thomas More College: New commercial cooking areas — this area required new hdpe lines to service waste requirements from sinks into a new grease trap. All existing required services were located with new connections made into existing services for

Read More →

grk-indshedlogan-cover

Industrial Shed – Hume Doors

Hume Doors: New manufacturing/storage shed for Hume doors. This project required a large amount of civil storm water works to be undertaken along with all new sewer, water, fire and building storm water services. The building has multiple bathroom, kitchens

Read More →

grk-womens-hostel-cover

Women’s Hostel

Womens Hostel: This project involved 24 new single dwelling units. All new water, fire, sewer and storm water services were required on this project. A new 100mm QUU supplied water was required on this project. A new 100mm fire service

Read More →

grk-staugustines-cover

St Augustines College

St Augustines College: New commercial cooking areas — this area required new hdpe lines to service waste requirements from sinks into a new grease trap. All existing required services were located with new connections made into existing services for sewer,

Read More →

grk-stjosephs-cover

St Josephs Grandstand and Amenities Project, Tennyson

St Joseph’s Grandstand: This was an interesting project with new mains for water, sewer and storm water required. A new sewer pump station was supplied and installed to accommodate the amenities and change room area requirements. All new civil drainage

Read More →