grk-arb-cover

ARB Distribution shed: The industrial distribution centre for ARB. GRK undertook all services to this building including all civil, plumbing, fire, gas, storm water and mains water. This project required a diesel fire pump to be installed to achieve the required flow rates for the building. The front office has amenities for inside and outside staff. There are multiple amenities throughout the shed along with sinks and kitchenettes. We were required to size and supply a main gas line to spray-booth area for connection by others on this project.

grk-arb-sq